Not if the wall is structural. In an HDB flat, structural walls, columns, beams and slabs cannot be hacked, and any other hacking needs HDB approval first. In a condo, check with your MCST and get a professional engineer's assessment.
- Structural walls, columns, beams and slabs in an HDB flat cannot be hacked.
- Non-structural walls can be removed only with HDB approval, applied for by an HDB licensed contractor.
- In a condo, check with the MCST and get a Professional Engineer's assessment where needed.
- When buying resale, ask for approvals for any walls already removed.
Opening up a layout is one of the most common wishes of a new owner. The answer depends on one thing first: is the wall structural? A structural wall holds the building up and cannot be removed. A non-structural wall may be possible to remove, but you need approval before any work starts.
Structural walls: cannot be hacked, in an HDB flat or a condo.
Non-structural walls, HDB: may be possible, with HDB's approval before work starts. [2]
Non-structural walls, condo: MCST approval, and a Professional Engineer (PE) where required. [3][4]
Who applies (HDB): your HDB licensed contractor, with an acknowledgement form signed by you. [2]
How long: no official figure for an HDB flat. Guides quote a few days to about three weeks, longer if a PE is needed. [5]
What you cannot do
HDB marks structural walls on your flat's floor plan. The following cannot be hacked or tampered with: [1]
- Walls shaded in black on the floor plan
- Structural columns
- All beams and slabs
In a condo, structural elements such as slabs, beams, columns and walls cannot be altered without proper assessment by a Professional Engineer, according to BCA. [3]

If the wall is non-structural: how to apply in an HDB flat
You and your HDB licensed contractor must obtain HDB's approval before demolishing or hacking any wall, whether partly or fully. [2] Do not let anyone start first.
- Check the wall against your floor plan. If you are not sure, ask a Professional Engineer.
- Engage an HDB licensed contractor. Hacking and the application go through them.
- The contractor submits the online renovation application, together with an acknowledgement form signed by you as the flat owner.
- Track the application in My HDBPage (My Flat, Purchased Flat, Renovation).
- Start work only after approval, and hack only within the permitted hours below.
Even then, HDB may not approve the request if the wall turns out to affect the unit's structure, so do not assume a wall can go just because it looks thin.
If you own a condo
You are part of the management corporation (MCST) as a unit owner, so you will usually need its written approval before renovation starts. Your MCST or managing agent will tell you what they require for your development.
A PE may also be needed even for a non-structural wall. BCA has advised MCSTs that renovation involving demolition of non-structural elements, other than floor tiles, should have its plans endorsed by a civil or structural PE. [4]
- Ask your managing agent for the renovation application process and forms.
- Have a PE assess the wall and endorse the plan where required.
- Submit to the MCST and wait for written approval.
- Start work only after approval, within the hours your MCST allows.
How long does it take?
There is no single official timeframe for an HDB flat, and renovation sites quote different figures, so treat these as rough ranges. [5] Approval is commonly quoted at about a few days to three weeks, and it can take a month or more if a PE endorsement is requested. The hacking itself usually takes a few days. If you have a move-in date, ask your contractor to submit early and leave a buffer of a few weeks.
For a condo, the timing depends on your MCST and on how quickly a PE can assess the wall and endorse the plan. Ask the managing agent for their current turnaround before you commit to a schedule.
When can the hacking happen?
Wall demolition counts as noisy work. In an HDB flat, noisy works such as demolishing walls are allowed on Monday to Friday, 9am to 5pm. They are not allowed on weekends, public holidays and the eve of major public holidays. [6]
Once you have HDB's approval, the renovation should be completed within 1 month for an existing flat, or 3 months for a new flat. [6] In a condo, your MCST sets the hours and the renovation period, so check its rules before you fix a schedule.
Buying a resale unit? What to check
If the previous owner opened up the layout, you inherit that work. Before you commit:
- Get the layout plan and compare it with the unit. Ask which walls were removed.
- Ask for the approval documents for any hacking: the HDB approval, or the MCST approval and PE endorsement for a condo.
- Look at the condition of the unit. Cracks, rusty steel or rebar and spalling concrete (concrete breaking away from the surface) are signs to take seriously. A layperson cannot tell a structural crack from a non-structural one.
- Appoint a Professional Engineer if you see a structural crack, or a beam or slab that sags (deflection), that does not look acceptable. Do this before you commit.
FAQs
Can I hack a structural wall?
No. Structural walls, columns, beams and slabs cannot be hacked in an HDB flat, and a condo's structural elements cannot be altered without a PE's assessment.
Can I apply for the HDB approval myself?
The online application is submitted by your HDB licensed contractor, together with an acknowledgement form signed by you. You can track its status in My HDBPage.
Can a PE tell me if a wall is structural?
Yes. If your floor plan is unclear or you are in a condo, a PE can assess the wall and, where required, endorse the plan.
What if the unit I want to buy has no approval documents?
Ask the seller for them before you commit. If none exist, ask HDB or the MCST what it means for that unit, and consider a PE's opinion.
Can I knock down a non-structural wall in my HDB flat?
It may be possible, but you and your HDB licensed contractor must obtain HDB's approval before any demolishing or hacking of walls. HDB may not approve it if the wall affects the unit's structure.
How long does it take to get approval to hack a wall in an HDB flat?
There is no single official timeframe. Renovation guides commonly quote a few days to about three weeks, and it can take a month or more if a Professional Engineer endorsement is requested.
What should I check before buying a resale unit whose layout has been changed?
Get the layout plan and compare it with the unit, ask for the approval documents for any hacking, and look at the condition of the unit for cracks, rusty steel or rebar and spalling concrete. If there is a structural crack or deflection that does not look acceptable, appoint a Professional Engineer before you commit.
When can I hack walls in my HDB flat?
Noisy renovation works such as demolishing walls are allowed on Monday to Friday, 9am to 5pm. They are not allowed on weekends, public holidays and the eve of major public holidays. After HDB approval, renovation should be completed within 1 month for an existing flat and 3 months for a new flat.
- HDB, My Nice Home: structural walls in your flat
- HDB, My Nice Home: submit a renovation application
- BCA: what to know as a condo owner
- BCA: advisory on control of renovation works involving demolition (2014)
- Time ranges are from renovation guides such as Qanvast and Ohmyhome. They are not official figures.
- HDB, My Nice Home: how to renovate your HDB flat (renovation hours and completion period)
Checked 16 November 2026. Rules can change, so please check the official pages above before you plan any works.